Long Beach Building Standards Code Amendments – Construction in the Vicinity of Oil Wells/Methane Gas Mitigation

2 Documents in Project

Summary

SCH Number
2020050447
Lead Agency
City of Long Beach
Document Title
Long Beach Building Standards Code Amendments – Construction in the Vicinity of Oil Wells/Methane Gas Mitigation
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2021
Document Description
The project proposes to amend Title 18 of the Long Beach Municipal Code (LBMC) by adding Chapter 18.78, Construction in the Vicinity of Oil Wells, and Chapter 18.79, Methane Gas Mitigation. Chapter 18.78 requires the permittee of construction activities in the vicinity of oil/gas wells to submit documents with details on proposed well abandonment, future accessibility, above-well mitigation, and long-term safety evaluation to the California Geologic Energy Management Division and the City. Chapter 18.79 details the applicability of methane mitigation requirements, definitions, methane soil gas investigation, exemptions, site design levels, methane mitigation components, operations and maintenance, plan review and inspections, and post construction protocols, among others. Adopting Chapters 18.78 and 18.79 into LBMC Title 18, Long Beach Building Standards Code, would provide clarity and procedures for future development in the vicinity of oil/gas wells in Long Beach.

Contact Information

Name
Amy L. Harbin
Agency Name
City of Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Citywide

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.longbeach.gov/lbds/planning/environmental/reports/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print