PG&E Transmission Pipeline L-114 Replacement Project - Grant of Easement

4 Documents in Project

Summary

SCH Number
2020050321
Lead Agency
East Contra Costa County Habitat Conservancy
Document Title
PG&E Transmission Pipeline L-114 Replacement Project - Grant of Easement
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2021
Document Description
Grant of Easement by California Department of Parks and Recreation to PG&E to facilitate construction and future operation of the PG&E Transmission Pipeline L-114 both during and after PG&E’s Replacement Project. PG&E w ill acquire a 30-foot-wide by 2,000-foot-long easement to allow placement of a 24-inch-diameter natural gas transmission pipeline. The existing 22-inch transmission line would be retired in place by cutting and capping and slurry-filling the line, and PG&E will quit claim their 2,160-foot-long by 15- to 22.5-foot-wide easement along the retired segment. The new easement would grant PG&E the rights to install, operate, and maintain the new pipeline.

Contact Information

Name
Gina Benigno
Agency Name
California State Parks, Diablo Range District
Contact Types
Responsible Agency

Location

Counties
Contra Costa
Other Location Info
Marsh Creek State Park

Notice of Determination

Approving Agency
Department of Parks and Recreation
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
California Department of Parks and Recreation, Diablo Range District Office, located at 15751 Tesla Road, Livermore, CA 94550

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print