Streambed Alteration Agreement No. 1600-2020-0116-R2 (Bear Pen Timber Harvesting Plan 2-20-00011-BUT, The CHY Company)

Summary

SCH Number
2020050120
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
Streambed Alteration Agreement No. 1600-2020-0116-R2 (Bear Pen Timber Harvesting Plan 2-20-00011-BUT, The CHY Company)
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2020
Project Applicant
Department of Forestry and Fire Protection

Document Description
The projects are limited to the replacement of an undersized corrugated metal pipe (CMP), the removal of a CMP and installation of a dipped crossing, and the installation of a vented ford crossing.

Contact Information
Clint Garman
Department of Fish and Wildlife
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

Phone : (916) 247-2436

Location

Counties
Butte
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in Butte County, within CALWATER watersheds Oroleve Creek, Lewis Flat, and their connecting tributaries; Township 20N, Range 7E, Sections 27 and 33 of U.S. Geological Survey (USGS) Quad Map Clipper Mills; Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The timber harvesting plan prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2020050120_1600-2020-0116-R2   PDF 263 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print