Conway Ranch Shoulders

7 Documents in Project

Summary

SCH Number
2020050030
Lead Agency
California Department of Transportation, District 9 (DOT)
Document Title
Conway Ranch Shoulders
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2022
Document Description
The California Department of Transportation (CALTRANS) is considering the “Conway Ranch Shoulders Project” to construct 8-foot wide shoulders on both sides of U.S. Route 395 near Lee Vining from the junction of State Route 167 (postmile 58.24) to 0.4-mile north of Conway Ranch Road (postmile 60.40). In addition to shoulder widening, drainage/culverts will be upgraded to match new pavement. A chain installation/removal area will be extended and switch-controlled area lighting will be installed. A project report and Categorical Exemption for this project were finalized April 2020 and posted under State Clearing House number: 2020050030. However, several design changes have occurred, necessitated a supplemental project report and elevated environmental document.

Contact Information

Name
Austin West
Agency Name
California Department of Transportation
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated
Counties
Mono
Regions
Unincorporated
Cross Streets
Conway Ranch Road/US 395 and State Route 167/US 395
State Highways
US 395
Other Location Info
Route 167 (postmile 58.2) to 0.4 mile north of Conway Ranch Road (postmile 60.4).

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mono
Final Environmental Document Available at
500 South Main St, Bishop, CA 93514

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print