FILING OF NOTICE OF DETERMINATION IN COMPLIANCE WITH SECTION 21108 OR 21152 OF THE PUBLIC RESOURCES CODE

2 Documents in Project

Summary

SCH Number
2020049062
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
FILING OF NOTICE OF DETERMINATION IN COMPLIANCE WITH SECTION 21108 OR 21152 OF THE PUBLIC RESOURCES CODE
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2020
Document Description
The DTSC has approved a Removal Action Work Plan for the LeFiell Manufacturing Company Facility pursuant to Chapter 6.8, Division 20, Sections 25323.1 and 25356.1 of the California Health & Safety Code. The RAW provides a scope of work for remediation of soil, soil vapor and groundwater underlying the Site, which are impacted with a variety of Volatile Organic Compounds (VOCs). The remediation action will be accomplished by implementing air sparge (AS) and soil vapor extraction (SVE) within the Building F area of the Site, SVE within Site Building H of the Site, and, as necessary and appropriate, further Site-wide groundwater assessment, pilot testing and corrective action.

Contact Information

Name
Tajinder Gill
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Santa Fe Springs
Counties
Los Angeles

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print