Stratford Kings River Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081 2022-046-04 (ITP)

9 Documents in Project

Summary

SCH Number
2020049051
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
Stratford Kings River Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081 2022-046-04 (ITP)
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2022
Document Description
The Project involves the replacement of the existing State Route 41 bridge over the Kings River, the replacement of existing overside drains, the placement of new armoring within the stream and a 34-mile-long detour around the Project location. Project activities will result in temporary impacts to 0.87 acres of riparian habitat, which may provide suitable nesting habitat features, and 0.28 acres of dry grains seed crops, and 0.33 acres of irrigated row field crops that provide suitable foraging habitat.

Contact Information

Name
Javier Mendez
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Kings
Regions
Southern California
State Highways
41
Township
20S
Range
20e
Section
19
Base
MDB&M
Other Location Info
The Project will occur where State Route 41 crosses the Kings River southwest of the community of Stratford in Kings County. Project-related activities will occur near latitude 36.180131 / longitude -119.834626 in the east half of Section 19, Township 20 South, Range 20 East, Mount Diablo Baseline and Meridian (MDB&M). The Project Area can be located on the Stratford, California 7.5-minute quadrangle United States Geological Survey (USGS) topographic map.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print