State Route 41 Stratford Kings River Bridge Replacement Project (EPIMS No. EPIMS-KIN-13591-R4)

9 Documents in Project

Summary

SCH Number
2020049051
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
State Route 41 Stratford Kings River Bridge Replacement Project (EPIMS No. EPIMS-KIN-13591-R4)
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2022
Document Description
The Project involves the replacement of the existing State Route 41 bridge over the Kings River, the replacement of existing overside drains, the placement of new armoring within the stream and a 50-milelong detour around the Project location.

Contact Information

Name
Rachel Flanagan
Agency Name
Caltrans
Job Title
Staff
Contact Types
Lead/Public Agency

Name
Javier Mendez
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Kings
Regions
Northern California
Other Location Info
The Project will occur where State Route 41 crosses the Kings River southwest of the community of Stratford in Kings County. Project-related activities will occur near latitude 36.180131 / longitude -119.834626 in the east half of Section 19, Township 20 South, Range 20 East, Mount Diablo Baseline and Meridian (MDB&M). The Project Area can be located on the Stratford, California 7.5-minute quadrangle United States Geological Survey (USGS) topographic map.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kings
Final Environmental Document Available at
2015 E Shields Ave, Suite 200, Fresno, CA 93726

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print