Westside Road Bridge Replacement Project

6 Documents in Project

Summary

SCH Number
2020049034
Lead Agency
City of Redding
Document Title
Westside Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2022
Document Description
The Project will replace the existing Westside Road Bridge with a new two-lane, three-span cast-in-place reinforced concrete slab bridge. The new bridge will be supported on concrete piles and columns at the piers and reinforced concrete diaphragm type abutments supported on concrete spread footings. The proposed bridge will provide two 12-foot travel lanes, 4-foot shoulders, and concrete barriers. A 6-foot-wide sidewalk will be constructed on the west side of the bridge to accommodate pedestrian traffic. The bridge will have a width of 40-feet 11-inches between edges of the deck. The overall superstructure depth is 1-foot 3.5-inches, with a total length of 84 feet (the new bridge will be approximately 4 feet wider than the existing bridge, and the overall length will match the existing length). The soffit elevation of the proposed bridge will approximately match the existing bridge and will be set to pass the 100-year flood event with no freeboard.

Contact Information

Name
Lynn Coster
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Redding
Counties
Shasta
Regions
Northern California
Township
31 N
Range
5 W
Base
MDB&M
Other Location Info
4301 Westside Road

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration is available to the general public at: Planning Division Public Works Department, City of Redding, 777 Cypress Avenue, Redding, CA 96001.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print