State Route 217 San Jose Creek Bridge Replacement (Lake or Streambed Alteration Agreement No. EPIMS-SBA-18681-R5)
4 Documents in Project
Summary
SCH Number
2020049028
Lead Agency
California Department of Transportation, District 5
(DOT)
Document Title
State Route 217 San Jose Creek Bridge Replacement (Lake or Streambed Alteration Agreement No. EPIMS-SBA-18681-R5)
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2022
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SBA-18681-R5), pursuant to Fish and Game Code section 1602, the project Applicant, California Department of Transportation. The project is limited to replacing the San Jose Creek Bridge on
State Route 217, reconstructing the bridge approaches, and realigning the multiuse path. The 7-span bridge will be replaced with a 2-span bridge, which will reduce the number of columns in San Jose Creek. This project will also include realigning the multi-use path and a small roadside, vegetated drainage to accommodate the higher bridge profile.
Contact Information
Name
Erika Cleugh
Agency Name
California Department of Fish and Wildlife, South Coast Region
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Santa Barbara
Counties
Santa Barbara
Regions
Southern California
Cross Streets
See below "Other Location Info."
Other Location Info
The project is located on State Route 217 where it crosses San Jose
Creek; Latitude 34.420797, Longitude -119.829759.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Barbara
Final Environmental Document Available at
The mitigated negative declaration/negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.