NOD 5A52CR00209 Champlin Slough Bridge Replacement Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020049004
- Lead Agency
- California Department of Transportation, District 2 (DOT)
- Document Title
- NOD 5A52CR00209 Champlin Slough Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/24/2021
- Document Description
- The project will replace the current bridge to address structural concerns and integrity. The proposed work includes replacing the existing 65-foot-long by 42-foot-wide three-span bridge over Champlin Slough with an 85-foot-long by 42-foot-wide precast clear-span bridge. Other work will include reconstructing the roadway approaches to match the new bridge profile, placing new Midwest Guardrail System guard railing along both approaches to the new bridge, placing rock slope protection at the bridge abutments, and striping the roadway.
- Contact Information
-
Lynn Coster, Senior Environmental Scientist
Central Valley Regional Water Quality Control Board
Responsible Agency
364 Knollcrest Drive, Suite 205
Redding, CA 96002
Phone : (530) 224-2437
Lynn.Coster@waterboards.ca.gov
Location
- Coordinates
- 39°59'4.2"N 122°4'52.5"W
- Cities
- Los Molinos
- Counties
- Tehama
Notice of Determination
- Approving Agency
- Central Valley Regional Water Quality Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Central Valley Regional Water Quality Control Board's Adopted Orders Web page (https://www.waterboards.ca.gov/centralvalley/board_decisions/adopted_orders/401_wqcerts/)
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- NOD 5A52CR00209 Champlin Slough Bridge Replacement Project PDF 426 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.