Final Lake or Streambed Alteration Agreement, Notification No. EPIMS-SON-17943-R3, State Route 1 Soldier Pile Wall Project (04-0J300)
5 Documents in Project
Summary
SCH Number
2020040415
Lead Agency
California Department of Transportation, District 5
(DOT)
Document Title
Final Lake or Streambed Alteration Agreement, Notification No. EPIMS-SON-17943-R3, State Route 1 Soldier Pile Wall Project (04-0J300)
Document Type
NOD - Notice of Determination
Received
Posted
10/18/2021
Document Description
The Soldier Pile Wall Project (Project) is limited to substructure rehabilitation at five (5) project locations at Post Mile (PM) 26.67, 26.72, 26.91, 27.05, and 26.79 along State Route 1 (SR-1) in Sonoma County (Latitude: 28.28473, Longitude: -123.1051 to Latitude: 38.28585, Longitude: -123.10255), approximately 3.5 miles northwest of Jenner and 0.3 miles west, northwest of the intersection of SR-1 and Myers Grade Road.
Contact Information
Name
Will Kanz, Environmental Scientist
Agency Name
CDFW
Contact Types
Responsible Agency
Phone
Location
Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Soldier Pile Wall Project (Project) is limited to substructure rehabilitation at five (5) project locations at Post Mile (PM) 26.67, 26.72, 26.91, 27.05, and 26.79 along State Route 1 (SR-1) in Sonoma County (Latitude: 28.28473, Longitude: -123.1051 to Latitude: 38.28585, Longitude: -123.10255), approximately 3.5 miles northwest of Jenner and 0.3 miles west, northwest of the intersection of SR-1 and Myers Grade Road.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.