Mission College Data Center
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020040254
- Lead Agency
- California Energy Commission
- Document Title
- Mission College Data Center
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/18/2020
- Present Land Use
- Site
- Document Description
- The project site is located at 2305 Mission College Boulevard within the City of Santa Clara. The project would include construction of two, three-story data center buildings encompassing a total square footage of 490,000, and a backup generating facility with a generation capacity of up to 78.1 MW to support the need for the MCDC to provide uninterruptible power supply for its tenant’s servers. The generation facility would consist of 43, 2.5-MW diesel-fired emergency backup generators, arranged in two generation yards, each designed to serve one of the two data center buildings with backup power and redundant backup power. Project elements would also include switchgear and distribution cabling to interconnect the two generation yards to their respective buildings. Two house power diesel fired generators, each capable of generating 600 kilowatts (kW) to support its respective building phase in an emergency, are also proposed. The MCDC would be supplied electricity by Silicon Valley Power (SVP) through a new distribution substation constructed by Oppidan in the northeast corner of the MCDC site and to be owned and operated by SVP.
- Contact Information
-
Leonidas Payne
California Energy Commission
Lead/Public Agency
1516 9th St
Sacramento, CA 95814
Phone : (916) 651-0966
leonidas.payne@energy.ca.gov -
Oppidan
Project Applicant
Location
- Cities
- Santa Clara
- Counties
- Santa Clara
- Cross Streets
- Mission College Blvd and Agnew Rd.
Notice of Determination
- Approving Agency
- Commissioners
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=19-SPPE-05
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2020040254_CDFW Receipt PDF 572 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.