Mission College Data Center

2 Documents in Project

Summary

SCH Number
2020040254
Lead Agency
California Energy Commission
Document Title
Mission College Data Center
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2020
Present Land Use
Site
Document Description
The project site is located at 2305 Mission College Boulevard within the City of Santa Clara. The project would include construction of two, three-story data center buildings encompassing a total square footage of 490,000, and a backup generating facility with a generation capacity of up to 78.1 MW to support the need for the MCDC to provide uninterruptible power supply for its tenant’s servers. The generation facility would consist of 43, 2.5-MW diesel-fired emergency backup generators, arranged in two generation yards, each designed to serve one of the two data center buildings with backup power and redundant backup power. Project elements would also include switchgear and distribution cabling to interconnect the two generation yards to their respective buildings. Two house power diesel fired generators, each capable of generating 600 kilowatts (kW) to support its respective building phase in an emergency, are also proposed. The MCDC would be supplied electricity by Silicon Valley Power (SVP) through a new distribution substation constructed by Oppidan in the northeast corner of the MCDC site and to be owned and operated by SVP.

Contact Information

Name
Leonidas Payne
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Name
Agency Name
Oppidan
Contact Types
Project Applicant

Location

Cities
Santa Clara
Counties
Santa Clara
Cross Streets
Mission College Blvd and Agnew Rd.

Notice of Determination

Approving Agency
Commissioners
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print