Tie Replacement

Summary

SCH Number
2020040192
Lead Agency
LOSSAN Rail Corridor Agency
Document Title
Tie Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
4/16/2020
Project Applicant
LOSSAN Rail Corridor Agency

Document Description
Replace approximately 125 miles of old railroad ties to enhance overall operations and reliability of passenger rail service. The project would improve operational flexibility and reliability by eliminating speed restrictions, resulting in reduced travel time, increased ridership and reliability, and GHG emissions reduction.

Contact Information
James Campbell
LOSSAN Rail Corridor Agency
600 S. Main Street
Orange, CA 92863

Phone : (714) 560-5390

Location

Counties
Santa Barbara
Other Location Info
Between mileposts 274.72 and 335.4 and also between 358 and 423.1 along the Union Pacific Santa Barbara Subdivision.

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
§21080(b)(10) [15275(a)]
Reasons for Exemption
This project has been determined to qualify for a Statutory Exemption under CEQA Guidelines Section 15275(a) [PRC §21080(b)(l O)] since the project would support mass transit passenger rail operations conducted by the LOSSAN Rail Corridor Agency on a rail line already in use. The project would facilitate with service reliability and improved efficiency.

Attachments

Notice of Exemption
2020040192_Tie Replacement SB NOEx   PDF 312 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print