Westside Canal Battery Storage Project (IID electrical distribution upgrade)

5 Documents in Project

Summary

SCH Number
2020040122
Lead Agency
Imperial County
Document Title
Westside Canal Battery Storage Project (IID electrical distribution upgrade)
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2022
Document Description
The project requires the upgrade of IID electrical distribution facilities (installation of ten power poles, conductors, etc.) whose design was not finalized when the FEIR was completed. IID as a Responsible Agency under CEQA, and per Secs. 15381, 15096(a), 15164, 15162 of the CEQA Guidelines, evaluated the upgrade and determined that they caused no significant environmental impacts and no additional mitigation measures required. An Addendum to the FEIR was prepared.

Contact Information

Name
Donald Vargas
Agency Name
Imperial Irrigation District
Job Title
Environmental Compliance Administrator
Contact Types
Responsible Agency

Location

Cities
El Centro
Counties
Imperial
Regions
Citywide, Countywide
Other Location Info
Mandrapas Road and Liebert Road, Imperial County, CA 92243

Notice of Determination

Approving Agency
Imperial Irrigation District
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
ICPDS at 801 Main St, El Centro, CA; Addendum at IID 321 S Waterman Ave, Ste 200, El Centro, CA

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print