Bechtel Engineering Center Renovation and Addition
12 Documents in Project
Summary
SCH Number
2020040078
Lead Agency
University of California
Document Title
Bechtel Engineering Center Renovation and Addition
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2022
Document Description
The proposed Bechtel Engineering Center Renovation and Addition project would provide approximately 34,700 net new gross square feet to support student academic support services and collaboration space needs and address the existing building’s deferred maintenance. Public realm improvements shall include expanded terrace and plaza spaces for studying and collaboration, and improved wayfinding and circulation. The project would also address deferred maintenance, including upgrades to mechanical systems, replacement of waterproofing, façade repairs, and removal of architectural barriers to accessibility
Contact Information
Name
Brian Harrington
Agency Name
University of California
Job Title
Director of Physical and Environmental Planning
Contact Types
Lead/Public Agency
Phone
Location
Cities
Berkeley
Counties
Alameda
Regions
San Francisco Bay Area
Other Location Info
Campus Park, UC Berkeley, bounded by Davis Hall immediately to the north, Hearst Mining Memorial Building to the east, Evans Hall to the south, and the West Plaza and McLaughlin Hall to the west.
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum #2 to the UC Berkeley 2021 LRDP EIR )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.