Interstate 405 at San Gabriel River Bridge Scour Mitigation Project (Lake or Streambed Alteration Agreement No. EPIMS-LAN-42733-R5)

5 Documents in Project

Summary

SCH Number
2020040064
Lead Agency
California Department of Transportation, District 7 (DOT)
Document Title
Interstate 405 at San Gabriel River Bridge Scour Mitigation Project (Lake or Streambed Alteration Agreement No. EPIMS-LAN-42733-R5)
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-LAN-42733-R5), pursuant to Fish and Game Code section 1602, the project Applicant, California Department of Transportation (Caltrans). The project is limited to mitigating scour on the mainline bridge of state route 405, the northbound onramp bridge from state route 605 to state route 405, and the southbound off-ramp bridge from the state route 405 to the state route 605. Activities to remediate scour include reinforcing the bridge footings and placing approximately 500 linear feet of rock slope protection within the bed of the channel.

Contact Information

Name
Erika Cleugh
Agency Name
California Department of Fish and Wildlife, South Coast Region
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Cross Streets
The project is located on State Route 405 where it crosses the San Gabriel River.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
he Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print