Notice of Determination - Allen Elementary School Replacement Project
5 Documents in Project
Summary
SCH Number
2020039043
Lead Agency
San Bruno Park School District
Document Title
Notice of Determination - Allen Elementary School Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2020
Present Land Use
School
Document Description
The Project would replace the existing school with five new buildings on the eastern and southern parts of the site, where the existing playfields are located. The site would be benched with upper and lower benches. Landscaped areas include a new amphitheater, outdoor classroom area, lunch area with picnic tables, two new play areas, and a new play field. A new parking area with 33 spaces would be provided, to be accessed from Linden Avenue. Capacity of the new school would be increased from the current 400 students to about 500 students, including about 75 students to be relocated from the District’s Hesselgren preschool at 525 Elm Street.
Contact Information
Name
Mariana Solomon
Agency Name
San Bruno Park School District
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
San Bruno Park School District
Contact Types
Project Applicant
Location
Cities
San Bruno
Counties
San Mateo
Cross Streets
875 Angus Avenue West, between Elm and Linden Streets
Zip
94066
Total Acres
5.3
State Highways
US101
Airports
San Francisco International
Schools
Hesslegren
Notice of Determination
Approving Agency
San Bruno Park School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.