Membrane Filtration Reverse Osmosis Facility Project

5 Documents in Project

Summary

SCH Number
2020039020
Lead Agency
City of Escondido
Document Title
Membrane Filtration Reverse Osmosis Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2023
Document Description
The San Diego Water Board, as a responsible agency, reviewed and considered the information contained in the Final MND related to matters within the San Diego Water Board’s jurisdiction in issuing this Order. The Order requires implementation of waste discharge requirements. Compliance with the conditions in the Order will ensure protection of applicable water quality objectives and beneficial uses. The San Diego Water Board independently finds that the impacts on hydrology and water quality from the construction and operations of the Facility will be less than significant with mitigation. The San Diego Water Board filed a notice of determination on September 18, 2023, in accordance with CEQA Guidelines section 15096(i).

Contact Information

Name
Brandon Bushnell
Agency Name
San Diego Regional Water Quality Control Board
Job Title
Water Resource Control Engineer
Contact Types
Responsible Agency

Location

Cities
Escondido
Counties
San Diego
Regions
Southern California
Zip
92025

Notice of Determination

Approving Agency
San Diego Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.escondido.org/Data/Sites/1/media/PDFs/Planning/mfro/FinalISMND042020.pdf

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print