Plumas 70 Permanent Restoration

4 Documents in Project

Summary

SCH Number
2020039005
Lead Agency
California Department of Transportation, District 2 (DOT)
Document Title
Plumas 70 Permanent Restoration
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2021
Document Description
The Project includes the repair and restoration of storm damaged locations along SR 70. The Project is limited to the vegetation removal, the aggregate addition on existing rock slope protection (RSP), the construction of new rail element walls on the slope, the excavation of a workbench, the construction of a tie back retaining wall, and the replacement of seven existing cross culverts. Excavation, drilling, backfilling, grading, compacting, concrete work, and RSP placement will be done on the river embankment.

Contact Information

Name
Harvey Tran
Agency Name
Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Plumas
Regions
Northern California
Other Location Info
The Project is located at eight locations on the embankment of the North Fork Feather River along State Route 70 in the County of Plumas, State of California. The post miles for this Project are PLU-70 PM 0.0 to 29.9.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Plumas
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of Project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print