Arvin-Edison FFP Eastside Canal lntertie

Summary

SCH Number
2020030392
Public Agency
Arvin-Edison Water Storage District
Document Title
Arvin-Edison FFP Eastside Canal lntertie
Document Type
NOE - Notice of Exemption
Received
Posted
3/10/2020
Document Description
The proposed project consists of the reconstruction and minor alteration of the Forrest Frick Pipeline (FFP) and Kem Delta Water District Eastside Canal (EC). The proposed intertie, approximately 75 feet in length. will convey up to 40 cubic feet per second from the FFP Access #2 through a metered pipeline to the EC. The proposed pipeline will commence as a 30" diameter, transition to 36" diameter. and then branch into two 42" diameter pipelines to slow discharge velocities before entering the outlet structure located on the west bank of the EC. The proposed EC outlet structure will be approximately 22' long x 6' wide by 9.5' deep and be comprised of approximately 20 cubic yards of reinforced concrete. The EC will be reinforced with erosion control improvements.

Contact Information

Name
Jeevan Muhar
Agency Name
Arvin-Edison WSD
Contact Types
Lead/Public Agency

Name
Agency Name
Arvin-Edison Water Storage District (AEWSD)
Contact Types
Project Applicant

Location

Counties
Kern
Other Location Info
The Project is located approximately 1/4 mile south of Muller Road and 1/4 mile west of Highway 184, approximately 3 miles southwest of Edison

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15302
Reasons for Exemption
Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the lime of the lead agency's determination. Class 2 consists of replacement or reconstruction of existing structures or facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print