Nojoqui Creek Barrier Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0218- R5)

Summary

SCH Number
2020030239
Lead Agency
Caltrans, District 5 - San Luis Obispo/Santa Barbara (California Department of Transportation, District 5)
Document Title
Nojoqui Creek Barrier Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0218- R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2020
Project Applicant
California Department of Transportation

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0218-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation (District 5). The project consists of replacing existing bridge rails with Type 85 concrete barriers and widening the two spans to current shoulder standards, which includes construction of six columns and footings to support the widened structures on the outside edge. Existing rock slope protection, present along the south bank of the creek, will be removed and replaced, adding an additional 190 sq. ft. of permanent impacts.

Contact Information
Baron Barrera
Department of Fish and Wildlife
3883 Ruffin Road
San Diego, CA 92123

Phone : (562) 342-7151

Location

Counties
Santa Barbara
Other Location Info
The project is located just south of the Santa Rosa exit on State Route 101 , south of the City of Buellton. The two bridge spans are located over Nojoqui Creek. The project can be located using the following information: Latitude 34.5965, Longitude -120.19387.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The mitigated negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFWs record related to the Lake or Streambed Alteration Agreement is available to the public for review at CDFWs regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2020030239_1600-2019-0218-R5 NOD   PDF 408 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print