Well No. 38 Arsenic Treatment-Water Supply Permit Amendment
2 Documents in Project
Summary
SCH Number
2020029025
Lead Agency
City of Turlock
Document Title
Well No. 38 Arsenic Treatment-Water Supply Permit Amendment
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2023
Document Description
The Project is the construction and operation of a water treatment system at the existing Well #38 site. The project includes the installation of a 24-foot tall equalization tank, three 15-foot tall vertical pressure filters, an 18-foot tall chemical storage enclosure, a future 24-foot tall equalization water storage tank, a future 16-foot tall pump station, and a generator for emergency power. The existing maintenance building will be demolished and a new 18-foot tall, 2,480 square foot maintenance building will be constructed. A 7-foot tall wrought iron fence will surround the site and landscaping will be installed along Christoffersen Parkway, Mountain View Road, and Sandstone Street. Off-site improvements include installation of a sidewalk along Mountain View Road. City· maintenance staff will access the site from the existing driveways on Christoffersen Parkway and Sandstone Street.
Contact Information
Name
Bhupinder Sahota
Agency Name
State Water Resources Control Board, Division of Drinking Water
Job Title
District Engineer
Contact Types
Responsible Agency
Phone
Location
Cities
Turlock
Counties
Stanislaus
Regions
Citywide
Cross Streets
2919 W. Christoffersen Pkwy
Zip
95382
Parcel #
087-026-005
Notice of Determination
Approving Agency
State Water Resources Control Board, Division of Drinking Water
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Stanislaus
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2020029025/2
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.