City of Stockton Bridge Rehabilitation (Streambed Alteration Agreement EPIMS Notification No. SJN- 13513-R2)

5 Documents in Project

Summary

SCH Number
2020029023
Lead Agency
City of Stockton
Document Title
City of Stockton Bridge Rehabilitation (Streambed Alteration Agreement EPIMS Notification No. SJN- 13513-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2021
Document Description
The Project is limited to the rehabilitation of three (3) separate bridges within the City of Stockton. The Project will consist of preventative maintenance work on each bridge, which will involve scour countermeasures, deck sealing with methacrylate, road approach repairs, joint seal replacements, concrete spall and drainage repairs, thermoplastic striping application, barrier rail and sidewalk replacements, and erosion control countermeasures.

Contact Information

Name
Ian Ralston
Agency Name
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Stockton
Counties
San Joaquin
Regions
Northern California
Waterways
Calaveras River (and Mormon Slough
Other Information
Bridge No. 29C0157R/L, Bridge No. 29C0238, and Bridge No. 29C0235

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of issuance of the Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print