Streambed Alteration Agreement No. 1600-2020-0031-R2 (Uber Timber Harvesting Plan 4-19-00184-ELD, Sierra Pacific Industries)

Summary

SCH Number
2020020557
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2020-0031-R2 (Uber Timber Harvesting Plan 4-19-00184-ELD, Sierra Pacific Industries)
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2020
Document Description
The project is limited to the construction of a temporary spittler crossing to be utilized by tractor equipment during timber harvest operations. The spittler crossing will be constructed by bundling cull logs and a 24-inch diameter by 20-foot long culvert pipe using chokers.

Contact Information

Name
Ian Boyd
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Department of Forestry and Fire Protection
Contact Types
Project Applicant

Location

Counties
El Dorado
Other Location Info
The project is located within the boundaries of a timber harvesting plan in El Dorado County, within CALWATER watershed North Sly Park Creek. The project location is found on the Old Iron Mountain 7.5-minute U.S. Geological Survey (USGS) Quadrangle Map Township 10N, Range 14E, and Section 21 Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print