Streambed Alteration Agreement No. 1600-2020-0029-R2 (Brass Creek Timber Harvesting Plan 4-19-00139-ELD, Sierra Pacific Industries)
Summary
SCH Number
2020020556
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2020-0029-R2 (Brass Creek Timber Harvesting Plan 4-19-00139-ELD, Sierra Pacific Industries)
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2020
Document Description
The projects are limited to the use of water drafting sites, replacement and installation of multiple types of crossings (project points 1, 2, 4, and 5.1), maintenance of an existing waterhole (project point 3), and maintenance of an existing spring fed ditch (project point 5.2). Equipment that is anticipated to be used for the projects include backhoes, skidders, chainsaws, water trucks, graders, dozers, transfer dump trucks, and excavators.
Contact Information
Name
Ian Boyd
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Department of Forestry and Fire Protection
Contact Types
Project Applicant
Location
Counties
El Dorado
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in El Dorado County, within CALWATER watersheds Brass Creek and Lower Pilot and their connecting tributaries; The project locations are found on the Tunnel Hill 7.5-minute U.S. Geological Survey (USGS) Quadrangle Map, Township 12N, Range 11E, Section 01 and Township 13N, Range 11E, Section 35; Mount Diablo Base and Meridian.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.