Rexford 2 Solar Farm (PSP 22-006)
6 Documents in Project
Summary
SCH Number
2020020326
Lead Agency
Tulare County
Document Title
Rexford 2 Solar Farm (PSP 22-006)
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
The majority of the Project site is zoned as AE-20 (Exclusive Agriculture – 20 acre minimum) and AE-40 (Exclusive Agriculture – 40 acre minimum). The Project site is designated as Valley Agriculture by the Tulare County General Plan.
Document Description
The Tulare County Planning Commission certified the Final Environmental Impact Report (State Clearinghouse No. 2020020326) and approved Special Use Permit No. PSP 19-073 for the Rexford Solar Farm Project (herein referred as “previously approved Project” or “Rexford 1”) on August 26, 2020. Rexford 1 involved the construction and operation of an up to 700 megawatt (MW) solar photovoltaic (PV) facility, including an energy storage system (ESS) with up to 700 MW storage capacity, on site substation, transmission and/or collector lines, and ancillary components on approximately 3,614 acres of land historically used as agricultural farmland in unincorporated Tulare County, California. Power generation by Rexford 1 would connect to the Southern California Edison (SCE) Vestal Substation. Construction of Rexford 1 is scheduled to commence in spring of 2022.
The Project applicant is now requesting the expansion of the previously approved Rexford 1 Solar Farm Project. The proposed Rexford 2 Solar Farm Project (“Rexford 2” or “Project”) is the subsequent development phase of the Rexford 1 Project. The Rexford 2 Project site is located in close proximity to the Rexford 1 Project, with two parcels being immediately adjacent to the Rexford 1 Project.
In accordance with the California Environmental Quality Act (CEQA) (Pub. Resources Code §21000 et seq.), the County of Tulare Resource Management Agency (RMA) will be preparing a Supplemental EIR to evaluate the environmental effects associated with the Rexford 2 Project. Rexford 2 would involve the construction and operation of an up to 500 megawatts-alternating current (MW-AC) solar PV facility, including an ESS with up to 500 MW-AC storage capacity on approximately 1,200 acres near the unincorporated community of Ducor. The proposed Project would include a ground mounted PV solar power generating system, supporting structures, inverter modules, pad mounted transformers, ESS, access roads and fencing, and on-site substation. An operations and maintenance building may be constructed on the site.
The proposed Project would involve the construction of both transmission and collector lines. Power generated by the proposed Project would be transmitted to the Southern California Edison (SCE) Vestal Substation via an up to 230 kilovolt (kV) overhead and/or underground gen-tie line. The proposed transmission and/or collector lines would extend along existing roadway rights-of-way from various portions of the Project site (where substations are located) ultimately connecting to the SCE Vestal Substation. The transmission and/or collector lines will be located along portions of Road 192, Road 200, Road 208, Road 232, 24th Avenue, Avenue 42, Avenue 46, Avenue 56, Avenue 64, Avenue 68, and Avenue 72, or could possibly utilize additional nearby routings.
Contact Information
Name
Hector Guerra
Agency Name
Tulare County Resource Management Agency
Job Title
Chief Environmental Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ducor
Counties
Tulare
Regions
Unincorporated
Cross Streets
west of SR 65; generally north of Ave 56; east of Rd 200; south of Ave 72; west of Rd 224
Parcel #
319-160-007; 320-360-005; 321-010-002; 321-010-003; 321-140-009; 321-140-011
State Highways
State Route 65
Schools
Ducor Union Elementary
Waterways
White River
Township
23/24S
Range
26/27E
Base
MDBM
Other Location Info
Township 23 South, Range 26 East, Sections ; 13, 23-27, 34-36; and
Township 23 South, Range 27 East, Sections 7-8, 16-21 and 28-33; and
Township 24 South, Range 26 East, Sections ; 1-3, 10-15, 22-26, and 36; and
Township 24 South, Range 27 East, Sections 6-8.
Other Information
USGS 7.5 Minute Quads: Ducor, Richgrove, Sausalito School, and Delano East
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of Food and Agriculture (CDFA), Department of General Services (DGS), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
Development Types
Power:Solar (Megawatts 500)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.