Amendment #2 to the UC Davis Sacramento Campus 2020 Long Range Development Plan to Redesignate Land Use for the Parking Structure 7 Project
15 Documents in Project
Summary
SCH Number
2020020161
Lead Agency
University of California
Document Title
Amendment #2 to the UC Davis Sacramento Campus 2020 Long Range Development Plan to Redesignate Land Use for the Parking Structure 7 Project
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2023
Document Description
UC Davis proposes to modify the UC Davis Sacramento Campus 2020 Long Range Development Plan (2020 LRDP) land use designations to accommodate the proposed Parking Structure 7 (PS7) project. The PS7 project would develop a new, 1,259-stall parking structure east of the M.I.N.D. Institute on the eastern edge of Sacramento Campus. The PS7 project site is currently designated as Parking Structure and Ambulatory Care in the 2020 LRDP. A minor LRDP Amendment to the 2020 LRDP is proposed to redesignate approximately 1.27 acres of Ambulatory Care to Parking Structure, which consists of extending the southern boundary of the 2020 LRDP PS7 project site by 200 feet and the western boundary by 35 feet.
Contact Information
Name
Ha Ly
Agency Name
University of California
Job Title
Associate Director, Physical and Environmental Planning
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
University of California, Davis – Sacramento Campus
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum #2 to the 2020 LRDP EIR )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.