UCDH Campus Temporary Parking Lot Expansion

14 Documents in Project

Summary

SCH Number
2020020161
Lead Agency
University of California, Davis
Document Title
UCDH Campus Temporary Parking Lot Expansion
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2023
Document Description
This project will create approximately 330 new temporary parking spaces to be designated for UC Davis employees at five locations at the UC Davis Health Campus in Sacramento. Current Lot 22 would be extended to provide 160 stalls. A new area west of MIND would provide up to 121 stalls. The grassy area in front of FSSB Building 68 would provide 16 stalls, the southern corner of Vanderhoef quad area would provide 25 stalls, and a section of the north west corner at Institute for Regenerative Cures Building would provide 9 stalls. Construction at these locations include the removal of grassy areas, existing hardscape, sidewalks and ramps; grading, excavating, and backfill to create parking surfaces; and installing new gravel to create the parking areas. No new parking lot lighting is proposed. These parking lots are all temporary and have a life span of a maximum of 5 years. They will each be restored to their existing use and condition with new landscaping.

Contact Information

Name
Heather Davis
Agency Name
Campus Planning and Environmental Strewardship
Job Title
Interim Director Environmental Planning
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
UC Davis Sacramento Health Campus

Notice of Determination

Approving Agency
University of California, Davis
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print