Tisdale Bypass Sediment Removal 2020

5 Documents in Project

Summary

SCH Number
2020019015
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Tisdale Bypass Sediment Removal 2020
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2020
Project Applicant
Department of Water Resources, Division of Flood Management, Flood Maintenance Office
Present Land Use
Flood Control

Document Description
DWR prepared a CEQA addendum to address a change in the project, increasing a speed limit of 15mph to 30 mph for construction equipment excavating sediment from the Tisdale Bypass. A speed limit of 15 mph would potentially put DWR over the air quality threshold for NOx due to equipment run time and efficiency. An increase in speed, with dust suppression and other air and water quality BMPs present, will not change the original IS/MND analyzed impact of air quality from less than significant.

Contact Information
Shaun Rohrer
Department of Water Resources
3310 El Camino Avenue, Suite 140
Sacramento , CA 95821

Phone : (916) 574-0305
shaun.rohrer@water.ca.gov

Location

Coordinates
39°1'19.2"N 121°49'12"W
Counties
Sutter
Regions
Northern California
Waterways
Tisdale Bypass, Sacramento River, River Mile 119
Township
14N
Range
1E
Section
25

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Joint Operations Center, 3310 El Camino Avenue, Suite 140, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
NOD_TBSR2020_Addendum_082620   PDF 254 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print