State Route 12 Capital Preventive Maintenance Project - NOD
3 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2020019007
- Lead Agency
- Caltrans, District 4 - Bay Area/Oakland (California Department of Transportation, District 4)
- Document Title
- State Route 12 Capital Preventive Maintenance Project - NOD
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/1/2020
- Project Applicant
- Caltrans, District 4
- Present Land Use
- Transportation
- Document Description
- The State Route (SR) 12 Capital Preventive Maintenance (CAPM) Project in Sonoma County, California (Project) proposes to resurface the existing pavement on SR 12, including the shoulders, between Llano Road (Post Mile [PM] 11.0) and Farmers Lane (PM 17.4) from the outskirts of the City of Sebastopol to the City of Santa Rosa in Sonoma County. Additional work includes upgrading 4 curb ramps to meet American with Disabilities Act (ADA) standards, replacing up to 38 existing concrete approach slabs with 1.25-foot-thick new slabs, reconstructing drainage infrastructure, and upgrading up to 10,000 linear feet of the existing metal beam guardrail (MBGR) to Midwest Guardrail System (MGS). Along the eastbound SR 12 to southbound U.S. Highway 101 (U.S. 101) connector, a 300-linear-foot drainage system would be reconstructed on the outside shoulder from the end of the existing retaining wall to the existing sound wall. All work proposed would be within the Caltrans right of way (ROW).
- Contact Information
-
Sam Schoevaars
California Department of Transportation
111 Grand Avenue
OAKLAND, CA 94612-4604
Phone : (925) 323-1168
Sam.Schoevaars@jacobs.com
Location
- Cities
- Santa Rosa Sebastopol
- Counties
- Sonoma
- Cross Streets
- Llano Road and Farmers Lane
- Zip
- 95407
- State Highways
- State Route 12
Notice of Determination
- Approving Agency
- California Department of Transportation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://dot.ca.gov/caltrans-nearme/district-4/d4-popular-links/d4-environmental-docs
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- Yes (Categorical Exclusion)
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Final Document(s)
- 0K520_FED_20200608_ADA PDF 42217 K
- Notice of Determination
- 0K520_NOD_signed_20200701 PDF 76 K 2020 Filing Fee Cash Receipt PDF 325 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.