Delta Conveyance Project
19 Documents in Project
Summary
SCH Number
2020010227
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Delta Conveyance Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2025
Document Description
On December 21, 2023, DWR certified the environmental impact report (“EIR”) for, and approved, the Delta Conveyance Project. (State Clearinghouse No. 2020010227). The Delta Conveyance Project consists of the construction, operation, and maintenance of new State Water Project (“SWP”) water diversion and conveyance facilities in the Delta that would be operated in coordination with existing SWP facilities.
The Delta Conveyance Project includes the following key components and actions:
- Two intake facilities along the Sacramento River in the north Delta near the community of Hood with on-bank intake structures that would include fish screens.
- A concrete-lined tunnel, and associated vertical tunnel shafts, to convey flow from the intakes about 45 miles to the south of the Bethany Reservoir Pumping Plant and Surge Basin at a location south of the existing SWP Clifton Court Forebay.
- A Bethany Reservoir Pumping Plant to lift the water from inside the tunnel below ground into the Bethany Reservoir Aqueduct for conveyance to the Bethany Reservoir Discharge Structure and into the existing Bethany Reservoir.
- Other ancillary facilities to support construction and operation of the conveyance facilities including, but not limited to, access roads, concrete batch plants, fuel stations, and power transmission and/or distribution lines.
- Efforts to identify geotechnical, hydrogeologic, agronomic, and other field conditions that will guide appropriate construction methods and monitoring programs for final engineering design and construction data collection and field work investigations, including ground-disturbing geotechnical work, water quality and hydrogeologic investigations, agronomic testing, the installation of monitoring equipment, construction test projects, pre-construction design work, and engineering work (“Pre-Construction Work”).
AVEK Water Agency, as a responsible agency, has issued a limited approval relating to additional funding for Pre-Construction Work for the Delta Conveyance Project. Apart from funding for the Pre-Construction Work, AVEK is not approving the broader Delta Conveyance Project with this current filing.
Contact Information
Name
Matthew Knudson
Agency Name
Antelope Valley-East Kern Water Agency
Job Title
General Manager
Contact Types
Responsible Agency
Phone
Email
Name
Tom Barnes
Agency Name
Antelope Valley-East Kern Water Agency
Job Title
Water Resource Manager
Contact Types
Responsible Agency
Phone
Email
Name
Katherine Marquez
Agency Name
California Department of Water Resources (DWR)
Job Title
Program Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Location
Counties
Alameda, Contra Costa, Sacramento, San Joaquin, Solano, Yolo
Regions
Northern California
State Highways
Interstate 5
Waterways
San Francisco Bay Area
Notice of Determination
Approving Agency
Antelope Valley-East Kern Water Agency
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.