Burbank Water and Power Campus StormwaterImprovement Project

4 Documents in Project

Summary

SCH Number
2019129091
Lead Agency
City of Burbank
Document Title
Burbank Water and Power Campus StormwaterImprovement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/19/2023
Document Description
The project proposes construction of stormwater improvements on the Burbank Water & Power (BWP) campus and the adjacent off-site storm water drainage system in order to comply with Regional, State, and Federal water quality standards. The project proposes to construct drainage improvements that would allow stormwater from adjacent properties to be intercepted and discharged into the Burbank Western Channel (BWC), a tributary of the Los Angeles River, through a new outfall structure. Once separated, on-site runoff would be largely retained on the BWP Campus and either infiltrated into the groundwater or used for cooling tower make-up (replenishment) water. The project's MND has been adopted as of June 13, 2023 and the attache notice of determination has been approved.

Contact Information

Name
Claudia Reyes
Agency Name
City of Burbank
Job Title
Senior Environmental Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Burbank
Counties
Los Angeles
Regions
Southern California
Cross Streets
Magnolia Boulevard near Victory Boulevard
Zip
91502
Total Acres
Approximately 40
State Highways
I-5, SR-134
Railways
Metrolink
Airports
Burbank-Hollywood
Waterways
Burbank Western Channel (BWC), Los Angeles River
Township
1N
Range
14W
Section
11
Base
SBBM

Notice of Determination

Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Burbank Water and Power, 164 W. Magnolia Blvd. Burbank, CA 91502 and at https://burbankwaterandpower.com/stormwaterproject

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print