10-0Y770 SR140 Mariposa CAPM Pavement Preservation Project

5 Documents in Project

Summary

SCH Number
2019129089
Lead Agency
California Department of Transportation, District 10 (DOT)
Document Title
10-0Y770 SR140 Mariposa CAPM Pavement Preservation Project
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2022
Document Description
The California Department of Transportation (Caltrans) proposes to dig out and repair localized areas of severe pavement failure and apply a preventive hot-mix asphalt overlay on the roadway surface on State Route 140 in Mariposa County between post miles 12.0 and 22.1. The project would also remove and replace three drainage inlets, four culverts, one flared-end section, and one sinkhole within the City of Mariposa. The project would also remove and replace six culverts and one sinkhole outside the city, and remove and replace a dike, rumble strips, and guardrails. Shoulder backing would be placed throughout the project limits. The project would also install Americans with Disabilities Act curb ramps at two intersection corners to meet current standards.

Contact Information

Name
Shawn Agarwal
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Jaycee Azevedo
Agency Name
California Department of Transportation
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
unincorporated area
Counties
Mariposa
Regions
Northern California
State Highways
SR 140, post miles 12.0-22.1

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Mariposa
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-10

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print