Initial Study Application No. 7326

3 Documents in Project

Summary

SCH Number
2019129056
Lead Agency
Fresno County
Document Title
Initial Study Application No. 7326
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2020
Project Applicant
Fresno County

Document Description
The project proposes the replacement of two structurally deficient bridges on Manning Avenue: the James Bypass Overflow Bridge Nos. 42C0066 and 42C0067. The scope of work includes placing an asphalt concrete overlay on approximately 790 feet of Manning Avenue to match the approach work associated with the proposed new bridges and complete the previously placed asphalt concrete overlay outside the current project limits, excavation for new abutments and wingwalls, and PG&E improvements to a section of gas main. The proposed project would increase public safety by replacing the existing structurally deficient bridges with bridges built to current design standards.

Contact Information
Jeremy Shaw
Fresno County
2220 Tulare Street, 6th Floor
Fresno, CA 93721

Phone : (559) 600-4207
jshaw@co.fresno.us

Location

Cities
San Joaquin
Counties
Fresno
Other Location Info
The project site is located on West Manning Avenue, Approximately 2.60-miles east of the nearest city limits of the City of San Joaquin, and approximately 3.50- miles west of State Route 145 (South Madera Avenue).

Notice of Determination

Approving Agency
Fresno County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Fresno County Department of Public Works and Planning, 2220 Tulare Street, Suite A, Corner of Tulare and "M" Streets, Fresno, California.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination
2019129056_IS 7326 NOD sch Filed   PDF 178 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print