Sierra College Boulevard Widening between Brace Road and Taylor Road (Streambed Alteration Agreement EPIMS Notification No. PLA-34867-R2)

4 Documents in Project

Summary

SCH Number
2019129052
Lead Agency
City of Loomis
Document Title
Sierra College Boulevard Widening between Brace Road and Taylor Road (Streambed Alteration Agreement EPIMS Notification No. PLA-34867-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2023
Document Description
The project is limited to the extension of an existing culvert under Sierra College Boulevard in conjunction with widening the road from 4-6 lanes and constructing sidewalks and bike lanes on both sides of Sierra College Boulevard. The existing culvert headwall will be removed and a 14 linear foot length of 60-inch corrugated metal pipe with a flared metal end section will be installed at the upstream end of the existing culvert. On the downstream end of the road crossing, a 34 linear foot length of 60-inch corrugated metal pipe with a flared end section will be added to the existing culvert. Rip rap will be installed at the downstream end of the culvert extension (approximately 35-feet long by 20-feet wide, 86 cubic yards).

Contact Information

Name
Patrick Moeszinger
Agency Name
California Department of Fish and Wildlife
Job Title
Senior Environmental Scientist Specialist
Contact Types
Responsible Agency

Location

Cities
Loomis
Counties
Placer
Regions
Northern California
Cross Streets
Taylor Road and Brace Road
Waterways
Sucker Ravine
Other Location Info
Sierra College Boulevard

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
CDFW's Regional Office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print