San Jose Creek Bridge Replacement, US-101
4 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2019129047
- Lead Agency
- Caltrans, District 5 - San Luis Obispo/Santa Barbara (California Department of Transportation, District 5)
- Document Title
- San Jose Creek Bridge Replacement, US-101
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/13/2020
- Project Applicant
- CA Dept. of Transportation (Caltrans)
- Document Description
- The California Department of Transportation (Caltrans) proposes to replace the existing northbound and southbound San Jose Creek bridges (Bridge Number 51-0163 R/L), to address the presence of reactive aggregates in the existing structure. The new bridge design would be a single-span structure and will be located at existing location. During construction, the following would occur: existing bridge structure would be removed and a new bridge will be constructed; the existing slope pavement would be removed and rock slope protection would be installed; existing...
- Contact Information
-
Matt Fowler
CA Dept. of Transportation
50 Higuera Street
San Luis Obispo, CA 93401
Phone : (805) 542-4603
Location
- Cities
- Goleta
- Counties
- Santa Barbara
- Other Location Info
- Highway 101, City of Goleta, Santa Barbara County
Notice of Determination
- Approving Agency
- CA Dept. of Transportation (Caltrans)
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Caltrans District 5 Office, 50 Higuera Street, San Luis Obispo, CA 93401
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 05-1H430 FED signed 200923 PDF 7229 K 2019129047_SJ Creek Bridge Replacement US-101 PDF 2539 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.