Tolowa Dee-Ni' Nation Wastewater System GP2019-22C
3 Documents in Project
Summary
SCH Number
2019119085
Lead Agency
Del Norte County
Document Title
Tolowa Dee-Ni' Nation Wastewater System GP2019-22C
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2020
Document Description
The Tolowa Dee-nl' Nation is proposing to repair and expand their wastewater collection, treatment, and disposal system In Smith River. The project Includes connecting Howenquet Village and Resort to the existing wastewater treatment facility behind Lucky 7 Fuel Marl via new sewer main connections along Lopez Road and Ocean View Drive. This would Involve the Installation of two new lift stations; one at HVR and one at APN 102-090-021 on Ocean View Drive, just north of Lopez Road. Technical repairs and Improvements would be made to the wastewater treatment system and the existing on-site wastewater disposal ponds located south of HVR would be filled in.
Contact Information
Name
N/A
Agency Name
Tolowa Dee-nl' Nation
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Tolowa Dee-ni' Nation
Contact Types
Project Applicant
Location
Counties
Del Norte
Other Location Info
Howonguet Village Resort to Tolowa Dee-nl' Nation Treatment Facility
Notice of Determination
Approving Agency
Tolowa Dee-nl' Nation
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.