North Round Valley Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2020-0055-R6

2 Documents in Project

Summary

SCH Number
2019119037
Lead Agency
Inyo County
Document Title
North Round Valley Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2020-0055-R6
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2020
Document Description
The proposed Project is limited to the removal and replacement of the existing North Round Valley Road Bridge (Bridge No. 48C0044) that was damaged during high flows in Pine Creek in 2017 (Exhibit A. Project Site Map). The proposed Project will replace the existing bridge with an approximately 85-foot (ft) single-span, precast/prestressed wide flange girder superstructure on high cantilever abutments founded on cast-in-drilled-hole concrete piles. Installation of the new bridge abutments will require two deep excavations (40-ft long by 12-ft wide) that may need to be stabilized with temporary shoring, requiring dewatering for placement of the concrete footings.

Contact Information

Name
Alyssa Marquez
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Inyo County Public Works Department
Contact Types
Project Applicant

Location

Counties
Inyo
Regions
Southern California
Other Location Info
The Project is located at Pine Creek along North Round Valley Road about 1 mile east of the unincorporated community of Rovana, in the County of Inyo, State of California; Latitude: 37.421372, -118.58842, Section 17, Township 6S, Range 31E, United States Geological Survey (USGS) map Rovana.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print