Final Removal Action Workplan for Brookside Drive
4 Documents in Project
Summary
SCH Number
2019110003
Lead Agency
Contra Costa County
Document Title
Final Removal Action Workplan for Brookside Drive
Document Type
NOD - Notice of Determination
Received
Posted
9/7/2023
Document Description
The project involves approval of a Removal Action Workplan for the Brookside Drive Project. DTSC is overseeing cleanup at the Site under a Standard Voluntary Agreement (HSA-FY17/18-137) with CenterPoint Properties Trust. project activities involve soil excavation to remove arsenic that exceeds soil screening criteria and lead that exceeds hazardous waste criteria. Approximately 2,500 cubic yards of soil are estimated to be removed for off-site disposal at a permitted facility. Cleanup activities will also involve excavation of approximately 12,000 cubic yards of organochlorine pesticide (OCP)-impacted soil and placement of the soil as engineered fill beneath a building footprint. The soil will be capped beneath a concrete floor and approximately one foot of base rock/non-expansive soil.
Contact Information
Name
Whit Smith
Agency Name
Department of Toxic Substances Control
Job Title
Senior Hazardous Substances Engineer
Contact Types
Responsible Agency
Phone
Email
Location
Cities
Richmond
Counties
Contra Costa
Regions
Citywide
Cross Streets
506-580 Brookside Drive
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=60002666
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.