Karnak Pump Station Erosion Repair and Debris Screen Retrofit

3 Documents in Project

Summary

SCH Number
2019109100
Lead Agency
Reclamation District 1500
Document Title
Karnak Pump Station Erosion Repair and Debris Screen Retrofit
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2020
Document Description
The Project is limited to the retrofit of the existing pump station’s debris screen and adjacent erosion repair. Project activities will include: (1) installation of approximately 320-feet of a new sheet pile wall along the south bank of the canal to remediate the erosion of the canal bank; (2) placement of approximately 500 tons of drain rock and approximately 130 cubic yards of topsoil backfill behind the sheet pile wall; (3) removal and replacement of approximately 350-feet of existing chain-link fence; (4) installation of nine new 10-foot wide automatic conveyor-belt style debris removal screens to replace the existing debris catchment system; and (5) implementation of seeding and erosion control measures based on the erosion control plan, including native plant seeds, sterile straw mulch, and erosion control blankets. This is to advise that CDFW, acting as a Responsible Agency, approved the above described project on the date signed below and has made the following determinations regarding the project pursuant to California Code of Regulations section 15096, subdivision (i):

Contact Information

Name
Zach Kearns
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Brad Mattson
Contact Types
Project Applicant

Location

Counties
Sutter
Regions
Northern California
Waterways
East Levee CAnal

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print