Interstate 580 Safety Lighting and Power Supply Installation Project
4 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2019109033
- Lead Agency
- Caltrans, District 4 - Bay Area/Oakland (California Department of Transportation, District 4)
- Document Title
- Interstate 580 Safety Lighting and Power Supply Installation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/3/2020
- Project Applicant
- California Department of Transportation (Caltrans), District 4
- Present Land Use
- Transportation
- Document Description
- The California Department of Transportation (Caltrans) proposes to construct the Interstate 580 (I-580) Safety Lighting and Power Supply Installation Project to improve existing roadway conditions and enhance traffic safety on the Altamont Pass. This will be accomplished by installing lighting along eastbound I-580 from West Grant Line Road Undercrossing to North Flynn Road Overcrossing near the City of Livermore in Alameda County (Postmile [PM] R1.3 to PM R6.0). The project will also install new power poles and electrical vaults on the southern side of the same expanse of I-580 (PM R1.3 to PM R6.0) to supply power for the lighting. The lighting pole foundations, necessary pull boxes, trench excavations, trenching, and subterranean conduit are currently being completed as part of the I-580 Pavement Rehabilitation Project.
- Contact Information
-
Brian Gassner
Caltrans, District 4
111 Grand Ave.
Oakland, CA 94612
Phone : (510) 286-6025
brian.gassner@dot.ca.gov
Location
- Cities
- Livermore Tracy
- Counties
- Alameda San Joaquin
- Regions
- Citywide Countywide
- Cross Streets
- West Grant Line Road Undercrossing to North Flynn Road Overcrossing
- Zip
- 94551
- State Highways
- Interstate 580
Notice of Determination
- Approving Agency
- California Department of Transportation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmental-docs
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2019109033_DFW753 PDF 347 K NOD 0K680 PDF 132 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.