Arroyo San Jose- Site 4A Spillway Retrofit & Bridge Replacement- Site 3A/4D Bank Stabilization - 2022 (Lake or Streambed Alteration Agreement No. EPIMS-MAN-282
6 Documents in Project
Summary
SCH Number
2019109031
Lead Agency
City of Novato
Document Title
Arroyo San Jose- Site 4A Spillway Retrofit & Bridge Replacement- Site 3A/4D Bank Stabilization - 2022 (Lake or Streambed Alteration Agreement No. EPIMS-MAN-282
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2023
Document Description
The Project is limited to bank stabilization, replacement of existing concrete bed with a series of boulder cascades, bridge replacement, and installation of a water diversion pipe. Project components are limited to the following activities:
1. Remove and replace an existing 8-foot-wide, 49-foot-long continuous span cement-topped bridge with a 16-foot-wide, 30-foot-long continuous span cement-topped bridge to service full sized emergency and service vehicles. To accommodate larger vehicles, the bridge and stream will be slightly re-aligned towards the right bank to provide a wider turning radius. The new bridge will result in an increase of 80 square feet of shaded stream.
2. Install a 30 linear foot wood lagging retaining wall, supported by six, 18-inch diameter concrete piers from the downstream left edge of the bridge and extending downstream to stabilize the eroding left bank. The retaining wall will be placed at the top of bank, backfilled with a layer of drainage rock and will be 2.8-feet tall.
3. Remove the majority of the concrete and grouted rock spillway (85 linear feet) starting 3 feet downstream of the flashboard assemblage. The existing spillway is undercut and deteriorating, and stream banks downstream have eroded significantly. A small amount of concrete may be left intact on the upper right bank just downstream from the bridge to protect existing riparian trees. The upstream most 20 linear feet of
the spillway will be replaced with two boulder cascades and the downstream 58 linear feet will be replaced with engineered boulder step-pool sequence with 8 boulder weirs. The final 11.7 linear feet will end with another boulder cascade that terminates at an existing scour pool. All existing concrete pieces will be removed from the scour pool then the pool will be rock armored. The edges of the boulder weirs along the
banks will be interplanted with willow (Salix sp.) posts. The step pool and boulder cascade design was informed by an in-depth analysis of site conditions and hydrology to determine appropriate weir spacing and rock configurations and sizing.
4. Install a 93-linear foot keyed rock toe, interplanted with willow posts, on the right bank of the scour pool to restore the severely eroded bank. Three rootwad and footer log complexes will be installed within the rock toe to improve pool habitat complexity. They will be angled in the upstream direction and anchored with boulders and bank backfill. Above the rock toe, a 6-foot-wide, 68-linear foot flood terrace will be constructed to engage flows above the 2-year flood level and will be planted with native riparian tree species. Landward from the flood terrace, vegetated soil lifts (VSLs) will be installed with live willow cuttings and a buried gravel back drain to provide a drainage path for bank seepage. The upper bank will then be graded back to match the VSLs stable 2:1 slope, pushing the top of bank approximately 8-feet landward from existing.
5. Install an 82-linear foot keyed rock toe, interplanted with willow poles, to support a 6-foot-wide floodplain terrace on the left bank slightly downstream of the scour pool. The terrace will be built to the same elevation as the right bank terrace. An existing maintenance building near the top of bank at this location will be removed and relocated at a later date further from the stream.
6. Install a 14-inch diameter pipe to divert pond water from Pond 4 to Pond 3, in accordance with the Marin Country Club Water Rights agreement. Pond 4 is upstream of the bridge and spillway replacement work and the pipe will extend 121 feet, starting 15.5 feet upstream of the replacement bridge and buried underneath the right side of the reconstructed spillway to eventually discharge within the newly built lower cascade. Approximately 324 cubic yards (CY) of sediment (0.2 acres) will be excavated from Pond 4 around the location of the new pipe installation to lower the grade approximately 4 feet and off-hauled to an off-stream storage facility for later reuse as alluvial bedding material to fill the interstitial voids in rock placement and other future upland maintenance applications on the golf course.
7. Stabilize the eroding left bank of Pond 4 for 89 linear feet from an upstream existing footbridge footing to the beginning of the spillway. Install a 3-foot tall rock toe and keyway to support a reconstructed 2:1 slope VSL bank interplanted with native dogwood (Cornus sp.) cuttings. At the top of the new VSL bank, an existing road will be replaced and slightly expanded to provide an adequate turning radius for large
emergency/service vehicles. Stormwater drainage will be directed from the upland portion of the road to a drop inlet in the middle of the replacement bridge.
The Project will result in 1,391 square feet and 55 linear feet of permanent impacts creating new impervious surface associated with bridge and retaining wall construction; 3,514 square feet and 264 linear feet of permanent impacts creating soil, rock planted with willows, or vegetated area associated with erosion control or floodplain terrace construction; and an additional 0.468 acres and 263 linear feet of temporary impacts caused by concrete removal, rock placement, sediment removal, bank stabilization, and temporary site access. To complete the Project, the channel will be dewatered and work will occur in the channel. Two coast live oaks (Quercus agrifolia) may be removed to complete the Project.
Contact Information
Name
Alexander Single
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Novato
Counties
Marin
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located at Arroyo San Jose, in the County of Marin, State of California;
Latitude 38.063644 °N, Longitude 122.563472 °W; in the northern ½ of Section 31, Township 3 North, Range 6 West of the Mount Diablo Base Range and Meridian; U.S. Geological Survey Novato 7.5-minute quadrangle; 500 Country Club Drive, Novato, CA 94949; Assessor’s Parcel Number 160-040-24.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
2825 Cordelia Road, Suite 100, Fairfield, CA 94534
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.