Lockheed Martin Harbor Island Facilities Demolition and Sediment Remediation Project
3 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2019100658
- Lead Agency
- San Diego, Port of
- Document Title
- Lockheed Martin Harbor Island Facilities Demolition and Sediment Remediation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/14/2020
- Present Land Use
- Industrial Business Park, Specialized Berthing
- Document Description
- The project includes demolition and offshore remediation of the Lockheed Martin Marine Terminal Facilities. The San Diego RWQCB issued a Cleanup and Abatement Order to Lockheed Martin Corporation due to pollutant wastes that were discharged into San Diego Bay. The project is separated into three phases. Phase 1 includes landside demolition of the Lockheed Martin marine terminal building and associated structures. Phase 2 includes waterside demolition of the pier and marine railway structure, dredging of the offshore sediments, and placement of clean sand cover. Phase 3 activities include removal of asphalt and concrete paving areas, grading of the site, and planting of drought-tolerant vegetation to return the site to its original undeveloped state.
- Contact Information
-
Juliette Orozco
San Diego Unified Port District
Lead/Public Agency
3165 Pacific Highway
San Diego, CA 92101
Phone : (619) 686-6237
jorozco@portofsandiego.org -
San Diego Unified Port District
Project Applicant
Location
- Coordinates
- 33°34'37.46"N 117°11'44.95"W
- Cities
- San Diego
- Counties
- San Diego
- Regions
- Citywide
- Cross Streets
- Harbor Island Drive and North Harbor Drive
- Zip
- 92101
- Total Acres
- 1.48
- Parcel #
- N/A
- State Highways
- 5
- Railways
- Amtrak, SD MTS
- Airports
- SDIA
- Schools
- High Tech High, Washington Elementary
- Waterways
- San Diego Bay
- Township
- n/a
- Range
- n/a
- Section
- n/a
- Base
- n/a
- Other Location Info
- n/a
- Other Information
- n/a
Notice of Determination
- Approving Agency
- San Diego Unified Port District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://www.portofsandiego.org/public-records/port-updates/notices-disclosures/ceqa-documents
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Environmental Document
- NOD Transmittal Letter to County PDF 239 K
- Notice of Determination
- NOD - Lockheed EIR_12-08-2020_signed PDF 189 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.