Lockheed Martin Harbor Island Facilities Demolition and Sediment Remediation Project

3 Documents in Project

Summary

SCH Number
2019100658
Lead Agency
San Diego, Port of
Document Title
Lockheed Martin Harbor Island Facilities Demolition and Sediment Remediation Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2020
Present Land Use
Industrial Business Park, Specialized Berthing
Document Description
The project includes demolition and offshore remediation of the Lockheed Martin Marine Terminal Facilities. The San Diego RWQCB issued a Cleanup and Abatement Order to Lockheed Martin Corporation due to pollutant wastes that were discharged into San Diego Bay. The project is separated into three phases. Phase 1 includes landside demolition of the Lockheed Martin marine terminal building and associated structures. Phase 2 includes waterside demolition of the pier and marine railway structure, dredging of the offshore sediments, and placement of clean sand cover. Phase 3 activities include removal of asphalt and concrete paving areas, grading of the site, and planting of drought-tolerant vegetation to return the site to its original undeveloped state.

Contact Information

Name
Juliette Orozco
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Name
Agency Name
San Diego Unified Port District
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Cross Streets
Harbor Island Drive and North Harbor Drive
Zip
92101
Total Acres
1.48
Parcel #
N/A
State Highways
5
Railways
Amtrak, SD MTS
Airports
SDIA
Schools
High Tech High, Washington Elementary
Waterways
San Diego Bay
Township
n/a
Range
n/a
Section
n/a
Base
n/a
Other Location Info
n/a
Other Information
n/a

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print