Streambed Alteration Agreement No. 1600-2019-0231-R2 "Oui Oui" THP 4-19-0155- ELD

Summary

SCH Number
2019100205
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2019-0231-R2 "Oui Oui" THP 4-19-0155- ELD
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2019
Document Description
The project is limited to the use of water drafting sites and the construction and/or repairs of five projects: 1) a permanent road crossing using a corrugated metal pipe (CMP); 2) construction of a new off-channel water hole; 3) implementation of a temporary impoundment to create an in-channel water drafting site; 4) maintenance of an existing waterhole; and 5) repair and deepening of a high-flow channel for an existing rocked crossing.

Contact Information

Name
Sandra Jacks
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Department of Forestry and Fire Protection
Contact Types
Project Applicant

Location

Counties
El Dorado
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in El Dorado County, within CALWATER watersheds Stoney Creek, Rocky Basin Creek, Lower and.Upper South Forks Rubicon River and connecting tributaries; Township 13N, Range 14E, Sections 9, 13, 14, 16, 17, 21, 22, 23, 26, 27, 28, 29, 34, 35; and Township 12N, Range 14E, Section 2 of U.S. Geological Survey (USGS) Quad Maps Robbs Peak and Loon Lake, Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print