Streambed Alteration Agreement No. 1600-2019-0225-R2 "Manoli" Timber Harvesting Plan 2-18-0189-NEV, Sierra Pacific Industries

Summary

SCH Number
2019100162
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2019-0225-R2 "Manoli" Timber Harvesting Plan 2-18-0189-NEV, Sierra Pacific Industries
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2019
Document Description
This rocked ford is adjacent to a water drafting site and will be repaired by reducing the slope of the eroding bank and adding rock through the crossing extending out 25 feet onto the road on both sides of the crossing. The rock will be 1.5-inch rock (minimum) placed at a 3-inch depth for the crossing. All work will be completed when the area is dry. If water is present in the crossing at the time of the repair, water may be diverted around the work site to ensure a dry work site.

Contact Information

Name
Sandra Jacks
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Department of Forestry and Fire Protection
Contact Types
Project Applicant

Location

Counties
Nevada
Other Location Info
The project is located along an unnamed intermittent tributary in the East Fork Creek Watershed, in Nevada County. Township 19N, Range 12E, Sections 16of U.S. Geological Survey (USGS) Quad Map Sierra City, Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print