Operation of Orange Grove RV Park (Park) - Reverse Osmosis Nitrate Treatment Project (Project)

Summary

SCH Number
2019100124
Lead Agency
Kern County
Document Title
Operation of Orange Grove RV Park (Park) - Reverse Osmosis Nitrate Treatment Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2019
Project Applicant
Kern County

Document Description
The Parks' proposed Project included the installation of a Reverse Osmosis (RO) treatment system to reduce nitrate concentration to below the nitrate maximum contaminant level. Existing storage tanks and pipelines will be used. Treatment wastewater will be blended with irrigation water and land applied to 30-acres of orange trees. The RO treatment system will consist of a RO membrane skid, a 25- horsepower pressure pump, a 55-gallon antiscalant chemical tank, and a 5,000-gallon brine waste tank. The treatment capacity is 100 gallons per minute.

Contact Information
Jaswinder Dhaliwal
State Water Resources Control Board
4925 Commerce Dr, Suite 120
Bakersfield, CA 93309

Phone : (661) 335-7315

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
1452 S. Edison Rd

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
This is to certify that the record of permit issuance for the Project is available to the general public at the State Water Board, Division of Drinking Water District Office noted above. The MND is available from the lead agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes