Lopez Drive Bridge Seismic Retrofit Project (Lake Alteration Agreement No. EPIMS-SLO-41639-R4)
4 Documents in Project
Summary
SCH Number
2019099097
Lead Agency
San Luis Obispo County
Document Title
Lopez Drive Bridge Seismic Retrofit Project (Lake Alteration Agreement No. EPIMS-SLO-41639-R4)
Document Type
NOD - Notice of Determination
Received
Posted
12/4/2023
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake Alteration Agreement number EPIMS-SLO-41639-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the County of San Luis Obispo.
The Project includes activities related to the seismic retrofitting of Lopez Drive Bridge through the installation of catcher bent systems at both bridge piers and demolition of the existing pier walls.
Contact Information
Name
Tal Starostinetsky-Malonek
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Regions
Southern California
Parcel #
048-061-057 and 047-021-013
Other Location Info
The Project will occur within Lopez Lake between Rock Falls Road and Hi Mountain Road, approximately seven miles northeast of the community of Arroyo Grande, San Luis Obispo County, State of California; Assessor’s Parcel Numbers 048-061-057 and 047-021-013; Latitude 35.18754° North, Longitude -120.45840° West.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Luis Obispo
Final Environmental Document Available at
976 Osos Street, Room 206
San Luis Obispo, California 93408
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.