Tule River Spillway Enlargement Road Realignment and Right Abutment Spillway Cut

Summary

SCH Number
2019099084
Lead Agency
Lower Tule River Irrigation District
Document Title
Tule River Spillway Enlargement Road Realignment and Right Abutment Spillway Cut
Document Type
MND - Mitigated Negative Declaration
Received
Project Applicant
Lower Tule River Irrigation District
Present Land Use
Existing road and spillway/ Foothill Agriculture Zone/ Foothill Agriculture

Document Description
The District and the United State Army Corps of Engineers (USACE) (Federal Sponsor) are proposing a spillway cut to widen the Success Dam Emergency Spillway and to realign a portion of an existing road (Worth Drive/ Avenue 146) from the spillway to a bench on the right abutment of the spillway. The spillway would be widened from 200 to 365 feet by blasting and removing the rock forming the right abutment during Project construction. A bench for the road would be blasted and excavated as part of the cut on the right abutment. Rock from the abutment would be used for the new roadbed and stockpiled for later construction phases.

Contact Information
Eric Limas
Lower Tule River Irrigation District
357 E. Olive Avenue
Tipton, CA 93272

Phone : (559) 686-4716

Location

Coordinates
36°03'37.82"N 118°55'9.35"W
Cities
Porterville
Counties
Tulare
Cross Streets
Avenue 146/Worth Drive
Zip
93257
Total Acres
Linear
Parcel #
Various
State Highways
190
Waterways
Tule River and Success Lake

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Road relocation and spillway modification)
Local Action
Road Relocation
Project Issues
Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Septic System Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Growth Inducing Land Use
Reviewing Agencies
California Air Resources Board California Department of Conservation California Department of Parks and Recreation California Department of Transportation, District 6 California Highway Patrol California Native American Heritage Commission California Regional Water Quality Control Board, Central Valley Fresno Region 5 California State Lands Commission Central Valley Flood Protection Board Department of Toxic Substances Control Department of Water Resources Office of Historic Preservation Resources Agency State Water Resources Control Board, Division of Water Quality State Water Resources Control Board, Division of Water Rights California Department of Fish and Wildlife, Central Region 4

Attachments

Environmental Document
LTRID Road Relocation public rev CEQA 9-22-19   PDF 2543 K Road Reloc CEQA newspaper notice 9-17-19   PDF 87 K Summary Form   PDF 102 K
NOC
NOC   PDF 921 K
State Comments
2019099084_CDFW_Tule River Spillway Enlargement Project   PDF 1537 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print