Pacheco Marsh Public Access Project (Project) (Lake or Streambed Alteration Agreement No. EPIMS-CCA-36852-R3)

7 Documents in Project

Summary

SCH Number
2019099043
Lead Agency
Contra Costa County Flood Control District
Document Title
Pacheco Marsh Public Access Project (Project) (Lake or Streambed Alteration Agreement No. EPIMS-CCA-36852-R3)
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2023
Document Description
The Project is limited to a subset of elements of the public access phase of the previously constructed Lower Walnut Creek Restoration Project. The Project will consist of the replacement of an entry bridge near Waterfront Road over an unnamed channel connecting to Lower Walnut Creek, a gravel water access ramp at an unnamed channel connecting to Lower Walnut Creek, and replanting/reseeding of disturbed areas. Depending on the bid selected, either a wildlife viewing screen or a pedestrian bridge will be constructed over a tidal channel connecting to Lower Walnut Creek.

Contact Information

Name
Tami Schane
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
unincorporated area
Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area
Other Location Info
The proposed Project site is located at two unnamed tributaries to the mouth of Walnut Creek, at an unincorporated area along Suisun Bay, approximately three miles east of the city of Martinez. The Project entrance is at Waterfront Road and the Project site extends between Waterfront Road and Suisun Bay just south of Lower Walnut Creek.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print