Ranchero Road Bridge Project

2 Documents in Project

Summary

SCH Number
2019099031
Lead Agency
City of Hesperia
Document Title
Ranchero Road Bridge Project
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2021
Document Description
The project proposes to replace the existing two-lane, two-span structure over the California Aqueduct with a new six-lane, single-span structure (refer to Figure 2 at the end of this chapter). The replacement bridge would be constructed for future accommodation of six lanes in support of the City's "ultimate" build out of Ranchero Road as a six-lane Special Major Arterial roadway, but it would be striped as a four-lane roadway and include a median and shared pedestrian sidewalk/bike pathways to correspond with the anticipated roadway capacity of Ranchero Road pursuant to the Ranchero Road WideningProject, which is four lanes.

Contact Information

Name
Tina Souza
Agency Name
City of Hesperia
Contact Types
Lead/Public Agency

Location

Cities
Hesperia
Counties
San Bernardino
Cross Streets
The project is located approximately 5-miles east of the Interstate 15/Ranchero Road Interchange
State Highways
Interstate 15
Other Location Info
The project is located approximately 5-miles east of the Interstate 15/Ranchero Road Interchange within the City of Hesperia, San Bernardino County

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Hesperia

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print