Ranchero Road Bridge Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2019099031
- Lead Agency
- City of Hesperia
- Document Title
- Ranchero Road Bridge Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/5/2021
- Document Description
- The project proposes to replace the existing two-lane, two-span structure over the California Aqueduct with a new six-lane, single-span structure (refer to Figure 2 at the end of this chapter). The replacement bridge would be constructed for future accommodation of six lanes in support of the City's "ultimate" build out of Ranchero Road as a six-lane Special Major Arterial roadway, but it would be striped as a four-lane roadway and include a median and shared pedestrian sidewalk/bike pathways to correspond with the anticipated roadway capacity of Ranchero Road pursuant to the Ranchero Road WideningProject, which is four lanes.
- Contact Information
-
Tina Souza
City of Hesperia
Lead/Public Agency
9700 Seventh Avenue
Hesperia, CA 92345
Phone : (760) 947-1474
tsouza@cityofhesperia.us
Location
- Cities
- Hesperia
- Counties
- San Bernardino
- Cross Streets
- The project is located approximately 5-miles east of the Interstate 15/Ranchero Road Interchange
- State Highways
- Interstate 15
- Other Location Info
- The project is located approximately 5-miles east of the Interstate 15/Ranchero Road Interchange within the City of Hesperia, San Bernardino County
Notice of Determination
- Approving Agency
- California Transportation Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- County Clerk
- San Bernardino
- Final Environmental Document Available at
- City of Hesperia
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 13 PDF 181 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.